OUR PROJECTS’ REFERENCES
Underground utilities engineering services
1
Design, Supply, Delivery, Installation, Testing And Commissioning Of 275KV Horizontal Directional Drilling (HDD) And Cable Bridge Works For A Data Centre At Southern Region Of Malaysia
98.0
2
Joint Venture Between Mutu Nusantara Sdn. Bhd. (“MNSB”) And Protech Builders Sdn. Bhd. (“PBSB”) (“JV Parties”) (“JV”)
Project Involving Sub-Contract Works For The Mechanical, Electrical And Plumbing Fit-Out Work Of A Data Centre Located At Central Region Of Peninsular Malaysia (“Project”).
49.0
3
Pelaksanaan Pilot Project Turnkey Beyond 2020 Di PPU Lagenda Taman. Lagenda, Teluk Intan, Perak Untuk Distribution Network (TNB Package A- Pilot Project Turnkey)
40.14
4
Design, Engineering, Procurement, Construction, Installation, Testing And Commissioning (EPCC) Of The Waste To Energy Interconnection Facility’S Transmission Lines Located At Central Region Of Peninsular Malaysia (“Project”).
37.91
5
Supply, Delivery, Installation, Testing & Commissioning Of Electrical Hdd & Open Cut Infrastructure Works At Eco Business Park V On Part Of PT49674 (HSD 306641) No3, Jalan Eko Perindustrian 5/5H, Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan For M/S Quantum Alpha Sdn. Bhd.
24.32
6
Engineering, Procurement, Construction And Commissioning Of Natural Gas Distribution System To Tanjung Malim FL Stage 1/22, Tanjung Malim, Perak Darul Ridzuan (Proton Tanjung Malim Sdn Bhd (Package I)
20.22
7
Proposed 132KV UGC From The Transmission Main Intake At Central Region Of Malaysia
13.49
8
Supply And Installation Of 132KV And 275KV High Voltage Underground Cable Work At Two Data Centres At Southern Region Of Malaysia.
13.30
9
Engineering, Procurement, Construction And Commissioning Of The East Coast Rail Link Project – Section 9 – Relocation Of Existing Electrical Services
13.09
10
Installation, Testing And Commissioning Of 33KV Aluminium XLPE Single Core Underground Cables And Accessories From PMU Gelang Patah To a Data Centre At Southern Regions
11.20
11
Proposed TThf2 Factory Construction At Ulu Klang Free Trade Zone, Kuala Lumpur, Malaysia For Texas Instruments Malaysia Sdn Bhd ~Works Package : 132KV Power House (P2) – Building Works & Mechanical System
8.3
12
Design & Build, Supply, Deliver To The Delivery Location, Installation, Factory Acceptance Test, Construct, Testing & Commissioning Of The Products.
7.72
13
Supply, Delivery, Installation Of One (1) Set 33KV Switchgear TNB Container Type Substation For A Data Center At Southern Region Of Malaysia.
7.0
14
TNB Piping Works At UMW Industrial Park For Longi Selangor Project
4.75
15
Proposed Development On PT67, Seksyen 40, Petaling Jaya, Selangor Darul Ehsan (Kelana Jaya Land) Letter Of Award For The Supply, Delivery Installation, Testing & Commissioning Of External HDD, TNB And Maxis Cabling Works
4.5
16
Proposed Development On Lot 2358,2359,2363 & 2364, Mont Kiara, Mukim Batu, Kuala Lumpur (MK31 Plot 1 And MK31 Plot 2)
4.47
17
Cadangan Membina Dan Menyiapkan 1 Unit Pencawang Pembahagian Utama (PPU) Di Atas PT 54501 (HSD 50622), Mukim Tanjung Duabelas, Daerah Kuala Langat, Selangor Darul Ehsan For MESSRS NCT Land Sdn Bhd
3.78
18
Letter Of Award For Supply, Delivery, Installation, Testing, Commissioning And Completion Of TNB Horizontal Directional Drilling (HOD) Work
3.6
1
Project involving the Engineering, Procurement And Construction of a Substation for a Data Centre located at Southern Region of Peninsular Malaysia (“Project”).
180.0
2
Provides infrastructure for Hosting, Data Processing Services and related activities In relation to the project involving the design and build of a 275/33 Kilovolt (“KV”) substation located in the Southern Region of Peninsular Malaysia (“Project”).
168.88
3
Project Involving Design, Build And Construction Of A High Voltage Main Switching Station (“SSU”) And Consumer Containerized SSU For A Hyperscale Data Centre Located At Southern Region Of Malaysia
162.59
4
Establishment of new PMU 275kV Kenyir switching station (GIS), Terengganu
137.80
5
Design, Supply, Installation, Maintenance, Testing And Commissioning For 275kv Consumer Landing Station (Plot 4) And 33kv Interim Consumer Landing Station (Plot 3) For Gds Data Centre At Nusajaya Technology Park, Johor Bahru, Johor, Malaysia
– Package 2 – 33kV Containerised,275kV CLS,275kV Main Building,Guard House,External Works, Landscape
136.24
6
Supply, Erect and Commissioning of PMU 132/11kV Kampung Awah GIS (2X30MVA), Pahang
86.0
7
PMU 132/11kV Santong Extention (1 X 132kV OHL BAY & 1 X 132kV TX BAY) – Supply to Battery Energy Storage System (BESS), Terengganu
63.0
8
Establishment of PMU 132/33kV Chuping Valley Industrial Area GIS (2 X 90MVA), Perlis
58.24
9
Design, Supply, Installation, Maintenance, Testing And Comissioning for 275KV Consumer Landing Station (Phase 2) for GDS data centre (PLOT 4) at Nusajaya Technoloogy Park, Johor Bahru, Johor, Malaysia (“Works”)
52.5
10
Design and build for EPCC of Proposed KTP Electrical Supply System for Cable Landing Station (CLS) Phase II, Di Atas Sebahagian PTD 181006, Jalan Kempas Lama, Mukim Tebrau, Daerah Johor Bahru, Johor Darul Ta’zim, Dayone Data Centers Malaysia II Sdn Bhd
39.5
11
EPC contract in relation to the 29.99MWac Solar Power Plant in Mukim Sungai Petani, Daerah Kuala Muda, Kedah, Malaysia
29.7
12
PMU 132/33kV Tanjung Langsat Industrial Estate Extension (2X90MVA), Johor Darul Ta’zim
29.3
13
Proposed Development Of Engineering Procurement, Construction And Commissioning (Epcc) Contractor For Spp Interconnection Facilities, Nur Interconnection Facilities And Related Peripheral System For 50Mwac Large Scale Solar Photovoltaic Energy Generating Facility For Nur Renewables Sdn Bhd At Lot 15,8766 (Lot Lama 1314) And Part Of Lot 10625 (Lot Lama 277), Mukim Padang China, Daerah Kulim Kedah.
25.95
14
Establishment of New PMU 132kV Bekok Switching Station (AIS), Johor
23.8
15
Design, Supply, Installation, Maintenance, Testing And Commissioning For 132kV And 33kV Interim Consumer Landing Station For Gds Data Centre (PLOT 2) At Nusajaya Technology Park, Johor Bahru, Johor, Malaysia (“Works”)
19.07
16
Supply, Erect and Commissioning of PMU 275/132kV Pasir Gudang Power Station Extension (2 X 275Kv OHL Bays), Johor
17.07
17
Mainhead II: Supply of 132kV And 275kV Current Transformer For Grid Maintenance (North), Grid Division, TNB
11.67
18
Mainhead II: PMU Kampung Gajah Extension (4 x 132kV OHL Bays), Perak
8.9
19
PMU 275kV Sedenak Extention (2 X 275kV UGC Bays) – 275kV Bulk Supply to Princeton Digital Group (PDG) Data Centre, Johor
8.2
20
PMU 275/132KV Elmina West Extention (2X275KV UGC Bays), Selangor – 275KV Bulk supply to Marmot Data Centre
8.0
21
Design, Supply, Installation, Maintenance, Testing and Comissioning for 275KV Consumer Landing Station (Plot 4) and 33kV Interim Consumer Landing Station (Plot 3) for GDS Data Centre at Nusajaya Technology Park, Johor Bahru, Johor Malaysia
– Package 1: Earthwork, Retaining Wall and Pilling Works (”WORKS”)
7.1
22
PMU 132kV Tanjung Kupang Extention (2X132KV OHL Bays), Johor.
6.55
23
Mainhead I: PMU Olak Lempit Extension (2 x 132kv OHL Bays), Selangor
5.65
24
Design, Supply, Install, Test and Commissioning of Electrical System for Intel Product (M) Sdn Bhd (INTEL KM8) on Lot PT1940 (HSD50302), Taman Perindustrian Kulim Hi-Tech Part, Mukim Padang Cina, Daerah Kulim, Kedah Darul Aman.
4.85
25
Bienial Supply & Delivery of Fuses, Insulated Type Service Cutout and Neutral Connector
4.75
26
Established Capacity of 100MWa.c at Merchang, Daerah Marang, Terengganu for Cypark Suria Merchang Sdn Bhd – Package 10
132kV Underground Cabling Installation for SPPIC
3.37